St George Hospital

Project Description

The centrepiece of the $277 million St George Hospital Redevelopment, the new Acute Services Building (ASB) features:
  • 52-bed intensive care and high dependency unit
  • 1 bed simulation intensive care bay
  • 8 additional digital and interventional operating theatres
  • 2 cardiac catheter laboratories
  • 128 inpatient beds
  • a new sterilising services department
  • an atrium linking to ED, Tower Ward Block and the Clinical Services Building
The ASB was completed in late 2017 with refurbishment works following.

Clare Loveday, Active Nurse Manager, Critical Care – St George Hospital

Close Menu